★★★★★ 4.4/5
🏆 MCS-cert · 110+ installs · within 2 hours response
★★★★★ Trustpilot · Rated Excellent
Ecoaim
8 min read · 2025-07-20 · Watch + Read

Solar + Battery Install in Livingston — Full Walk-Through

Behind the video: a real 4-bed Livingston solar+battery install. Sizing, install timeline, Octopus Flux config, year-one savings.

▶ Watch the video
📺 2:54 · install · View on the video page →

Watch the video first

📺 Solar & Battery Installation Livingston (2:54)

The setup

A typical 4-bed detached home in Livingston — three teenagers, two adults, one EV-curious driver. Combined gas+electric annual bills had crossed £3,400.

Quote: 8kWp solar + 10kWh battery + future-EV-charger pre-wire. Install timeline: 38 days from first call to commissioning.

What we installed

  • 8kWp solar: 18 × JA Solar 435W all-black panels, split across south-facing rear roof + east return
  • Battery: EcoFlow PowerOcean 10kWh in the integral garage
  • Inverter: EcoFlow PowerOcean P1-5kW single-phase
  • EV pre-wire: Type 2 socket + dedicated 32A spur (for the future Tesla)
  • Monitoring: EcoFlow app + Octopus Mini integration

Day 1: Roof survey + structural assessment

Standard concrete tile, late-1990s build. Structural fine for the array weight. South-facing rear roof oriented at 175° (close to ideal 180°), pitch 35°. Predicted yield 7,200 kWh/year via PVGIS modelling.

Day 28: HES loan approval + DNO clearance

HES interest-free loan approved at £11,000 (6,000 for solar + 5,000 for battery). SP Energy Networks G99 application accepted in 5 weeks.

Day 32-33: Install

Two-day install. Day 1: scaffolding, panel mounting, DC string runs. Day 2: inverter + battery commissioning, MCS sign-off paperwork.

First full month performance

May 2025 generation: 1,180 kWh. Self-consumed: 850 kWh. Exported: 330 kWh. Octopus Flux peak export: £62. Day-rate import: down 78% vs pre-install baseline.

Five months on — October bill: £18

This is the line that sticks — October bill came in at £18 (vs ~£280/month gas+electric pre-install).

The maths

YearCash position
Year 0 (install)-£3,500 outright + £132/mo HES (£11k over 7yr)
Year 1 saving£1,840
Year 1 net cash position-£3,500 + £1,840 - £1,584 HES = -£3,244
Year 7 (HES paid off)All saving is yours
Year 9Cumulative savings cover initial outlay + financing

Related

Call 03330 384 380 for a free quote in your postcode.

Ready for a free fixed-price quote?

Call 03330 384 380 or get a quote online — survey + quote within 24 hours.

More Ecoaim videos

Want to see more real installs? Watch our other YouTube videos and read the full deep-dives.

All 14 videos →
Ready when you are

Free quote in 24 hours.

No high-pressure sales. No commission-driven scripts. Just a no-obligation survey + transparent quote — covering every postcode in Scotland's Central Belt.

MCS Certified
TrustMark Registered
HES Grant Specialist
30-Year Panel Warranty
📞Call 💬WhatsApp Get Free Quote → Responds within 2 hours