150kWp ground-mount for Bathgate dairy farm
Mixed dairy/arable holding — 150kWp ground-mount with parlour load matching. Capital allowances stacked.
The project
A 320-acre family farm — predominantly dairy with arable rotation — looking to lock energy costs for the next 20 years. Parlour loads (cooling, milking machinery, sterilisation) align almost perfectly with solar generation curves.
Ground-mount across 2.5 acres of marginal land with limited grazing value. Three-phase G99 to SP Energy Networks. Capital allowances claim plus tied-cottage HES qualification on the connected farmhouse.
Now producing more annually than the farm consumes — export revenue offsets fixed grid charges.
Results
Free quote in 24 hours.
No high-pressure sales. No commission-driven scripts. Just a no-obligation survey + transparent quote — covering every postcode in Scotland's Central Belt.