50kWp + 30kWh BESS for Fife care home
Nursing home — 50kWp + 30kWh battery for night-time medical loads. EPS backup wired to critical circuits.
The project
32-bed nursing home with significant 24/7 electrical loads — oxygen concentrators, hoists, heating circulation pumps, kitchen, laundry. EPS-backup capability was non-negotiable; a power cut could be a clinical-safety event.
Sigenergy SigenStor 30kWh chosen specifically for its EPS backup. Battery wired to a critical-circuits sub-board covering medical equipment, nurse-call, emergency lighting, fridge/freezer.
December 2025: a 4-hour SP Energy Networks fault — the home ran seamlessly on battery the entire time. ROI achieved on that single event alone.
Results
Free quote in 24 hours.
No high-pressure sales. No commission-driven scripts. Just a no-obligation survey + transparent quote — covering every postcode in Scotland's Central Belt.