90kWp + battery for Stirling boutique hotel
Boutique hotel — 90kWp PV with 30kWh battery. Reduces day-rate purchase by 78%.
The project
24-room boutique hotel with extensive year-round occupancy. Day loads dominated by laundry, kitchen extraction and HVAC; evening loads peak at check-in (16:00–20:00). A solar+battery combination was ideal — generation matched daytime loads, battery shifted afternoon surplus into evening peaks.
SSEN territory (Stirling falls under SSEN, not SP Energy Networks) — different G99 portal. 14-week approval timeline. Installation across the hotel's sympathetic-design felt roof (with full reroof guarantee preservation).
Results
Free quote in 24 hours.
No high-pressure sales. No commission-driven scripts. Just a no-obligation survey + transparent quote — covering every postcode in Scotland's Central Belt.