Phase 1 — Free commercial solar feasibility
Before any commitment, we run a free feasibility study against your half-hourly meter data to model real-world performance, IRR, NPV and payback.
A proper feasibility study is the difference between a project that delivers as promised and one that disappoints. We model your specific load shape against potential solar output to derive a realistic self-consumption ratio — typically 70-92% for commercial sites.
Output: a 12-page report with IRR, NPV, payback, sensitivity analysis on tariff changes, and a clear go/no-go recommendation. No obligation.
What's included
- Half-hourly load analysis
- PVGIS yield modelling
- DNO capacity check
- IRR / NPV / payback model
- Capital allowance optimisation
- PPA vs CapEx vs lease comparison
See Ecoaim in action
Free quote in 24 hours.
No high-pressure sales. No commission-driven scripts. Just a no-obligation survey + transparent quote — covering every postcode in Scotland's Central Belt.