Factory & manufacturing solar
Manufacturing facilities have ideal solar profiles — large flat or shallow-pitch roofs, three-phase supply, predictable daytime load shape.
A 200kWp factory rooftop install typically saves £40,000-£60,000/year for a Scottish manufacturer paying commercial-rate electricity. Capital allowances cover roughly £80,000 of tax-deductible CapEx in year one.
For sites with high process heat demand alongside electricity, we can integrate CHP with solar PV for total energy efficiency above 80%.
What's included
- 100-500kWp+ standard size
- Three-phase supply integration
- 50% first-year capital allowance
- Heavy machinery load matching
- Process heat recovery integration
- Optional CHP + solar hybrid
See Ecoaim in action
Free quote in 24 hours.
No high-pressure sales. No commission-driven scripts. Just a no-obligation survey + transparent quote — covering every postcode in Scotland's Central Belt.