Agricultural & farm solar
Farms have ideal solar profiles — large south-aspect barn roofs, three-phase supply, daytime loads from milking parlours and refrigeration.
Agricultural solar in Scotland has flipped from niche to obvious. A typical 150kWp Bathgate or Falkirk dairy farm sees 4-6 year paybacks with 50% first-year capital allowance — and the parlour load shape captures 65-75% of generation on-site.
See our Bathgate dairy farm case study for full numbers.
What's included
- 50-300kWp+ ground-mount or barn-roof
- Three-phase G99 handled in-house
- Parlour and refrigeration load matching
- Capital allowances + ECO4 stack
- NFU Mutual / Cornish Mutual coordination
- Rural HES grant route consultation
See Ecoaim in action
Free quote in 24 hours.
No high-pressure sales. No commission-driven scripts. Just a no-obligation survey + transparent quote — covering every postcode in Scotland's Central Belt.