SP Energy Networks (formerly Scottish Power Distribution) is the DNO for the majority of central Scotland. They cover the bulk of our service area — Edinburgh, Glasgow, Falkirk, Fife, the Lothians and most of Lanarkshire.

G98 vs G99 — which applies?

  • G98 (notification only): Single inverter ≤ 16A per phase (~3.68kW single-phase). Notify within 28 days of commissioning — no pre-approval needed.
  • G99 (pre-approval): Anything larger. Connection offer issued first, then install, then commissioning. Connection offers typically issued in 6-12 weeks for standard sites; complex sites (capacity-constrained) can take 4-6 months.

Typical SP Energy Networks timeline

  1. Submit G99 application with single-line diagram + capacity request
  2. SP Energy Networks accepts application + acknowledges
  3. Connection offer issued (connection offers typically issued in 6-12 weeks for standard sites; complex sites (capacity-constrained) can take 4-6 months.)
  4. Accept offer + pay any reinforcement contribution if applicable
  5. Schedule install + commissioning
  6. Send commissioning certificate + MCS cert to SP Energy Networks

SP Energy Networks specifics

  • Strong online connections portal — accepts G98 and G99 submissions digitally.
  • Curtailment offered for grid-constrained sites under G100 ANM (Active Network Management).
  • Smart export tariffs work transparently — no DNO action needed once notified.
  • Three-phase upgrades typically 6-10 weeks lead time in our area.

Contact

Phone: 0330 1010 222
Portal: https://www.spenergynetworks.co.uk/pages/connections.aspx

Ecoaim handles every G98/G99 application on behalf of our customers — you don't touch a portal or speak to a DNO engineer unless you want to.

Get your free quote

No high-pressure sales. MCS-certified install. Quotes in 24 hours.

What happens next
  • 1.Call back within 2 hours (or first thing next morning if late)
  • 2.Free survey — no obligation, no pushy sales pitch
  • 3.Itemised quote in writing within 24 hours

Subject to eligibility, property type, scheme availability, and current funding limits.

CHSG t/a Ecoaim is an Introducer Appointed Representative of Ideal Sales Solutions Ltd, t/a Ideal4Finance. Ideal Sales Solutions Ltd is a credit broker and not a lender (FRN 703401). Finance available subject to status. The rate offered is always provisional and will depend upon your personal circumstances, the loan amount and the term.

Ready when you are

Free quote in 24 hours.

No high-pressure sales. No commission-driven scripts. Just a no-obligation survey + transparent quote — covering every postcode in Scotland's Central Belt.

MCS Certified
TrustMark Registered
HES Grant Specialist
30-Year Panel Warranty
📞Call 💬WhatsApp Get Free Quote → Responds within 2 hours