Solar & battery for care homes in Stirling
30-100kWp commercial PV installs across Stirling. PPA, lease or CapEx routes. We handle SSEN G99 application end-to-end.
Why solar makes sense for care homes in Stirling
Care Homes in Stirling typically run high daytime electrical loads — refrigeration, ventilation, lighting, machinery — which align almost perfectly with solar generation curves. With current commercial electricity at 28-38p/kWh and SEG export tariffs at 5-15p/kWh, the maths is straightforward: every kWh self-consumed is a kWh you don't buy.
Typical install size: 30-100kWp
For most care homes in the FK area, a 30-100kWp system is the sweet spot. We design to your half-hourly meter data — no oversizing, no wasted CapEx. Paybacks typically land in the 5-8 year range with current commercial energy prices.
Funding routes
- CapEx: Outright purchase. Best IRR. 50% first-year capital allowance against corporation tax.
- Hire Purchase (HP): Spread the cost over a fixed term while retaining ownership at the end. Monthly payments treated as operating cost.
- PPA (Power Purchase Agreement): Third party owns the asset, you buy the electricity at a fixed (lower) rate. Zero CapEx, Day-1 cash positive.
DNO process for SSEN
For commercial installs above 17kW per phase, a G99 application to SSEN is required. We've delivered dozens of approved applications and can typically achieve connection offer within 6-10 weeks for standard sites.
What's included
- EPVS-audited feasibility study with IRR/NPV/payback model
- Roof structural assessment
- SSEN G99 application
- Detailed design + procurement
- Installation overseen by Ecoaim engineers + vetted trade partners
- Commissioning, MCS certification, handover
- Optional O&M and monitoring
A recent care homes install
30-100kWp care homes system, Stirling area
Featured project detail — real care homes client outcome (figures, install timeline, customer quote) coming soon. Want to be the next case study? Talk to our commercial team about your site.
Care Homes on video
See Ecoaim's commercial projects across Scotland.
Free quote in 24 hours.
No high-pressure sales. No commission-driven scripts. Just a no-obligation survey + transparent quote — covering every postcode in Scotland's Central Belt.