★★★★★ 4.4/5
🏆 MCS-cert · 110+ installs · within 2 hours response
★★★★★ Trustpilot · Rated Excellent
Ecoaim
Real installs

Recent Ecoaim case studies.

8 named install stories from across Scotland's Central Belt — with system size, location, payback and outcome on the tin.

MCS Certified logo
MCS Certified
TrustMark logo
TrustMark
RECC logo
RECC
NICEIC
NICEIC
HIES
HIES
EPVS
EPVS
Octopus Energy Trusted Partner logo
Octopus Energy Trusted Partner
I4F
Ideal4Finance
8kWp solar + 10kWh battery in Livingston
Domestic
▶ Video
Livingston · EH54
8kWp solar + 10kWh battery in Livingston
8kWp · 10kWh

Detached 4-bed home — 8kWp JA Solar + EcoFlow PowerOcean 10kWh. Annual yield 7,200 kWh. October bill came in at £18.

7,200 kWh
Annual generation
74%
Self-consumption
Read full case study
Listed-building solar in Edinburgh New Town
Domestic
▶ Video
Edinburgh · EH3
Listed-building solar in Edinburgh New Town
4kWp

Heritage-sensitive 4kWp in-roof install with conservation officer pre-app. Slate-friendly hooks throughout.

11 weeks pre-app
Approval timeline
3,200 kWh
Annual generation
Read full case study
180kWp roof-mount on Falkirk warehouse
Commercial
Falkirk · FK2
180kWp roof-mount on Falkirk warehouse
180kWp

Distribution warehouse — 180kWp rooftop with SP Energy Networks G99 approval. 6-year payback.

162,000 kWh
Annual generation
92%
Self-consumption
Read full case study
90kWp + battery for Stirling boutique hotel
Hospitality
▶ Video
Stirling · FK8
90kWp + battery for Stirling boutique hotel
90kWp · 30kWh

Boutique hotel — 90kWp PV with 30kWh battery. Reduces day-rate purchase by 78%.

78%
Day-rate purchase reduction
£36,400
Annual saving
Read full case study
150kWp ground-mount for Bathgate dairy farm
Agriculture
▶ Video
Bathgate · EH48
150kWp ground-mount for Bathgate dairy farm
150kWp

Mixed dairy/arable holding — 150kWp ground-mount with parlour load matching. Capital allowances stacked.

143,000 kWh
Annual generation
68%
Self-consumption
Read full case study
60kWp + 4 workplace chargers in Glasgow city centre
Commercial
▶ Video
Glasgow · G1
60kWp + 4 workplace chargers in Glasgow city centre
60kWp · 20kWh · 4×22kW

City-centre office — 60kWp + 20kWh battery + 4× 22kW workplace chargers. Workplace Charging Scheme funded.

88%
Solar self-consumption
£14,200
Annual saving
Read full case study
50kWp + 30kWh BESS for Fife care home
Care Home
Dunfermline · KY12
50kWp + 30kWh BESS for Fife care home
50kWp · 30kWh

Nursing home — 50kWp + 30kWh battery for night-time medical loads. EPS backup wired to critical circuits.

£11,800
Annual saving
4hr Dec 2025
EPS event hours
Read full case study
ASHP install in Linlithgow conservation area
Heat Pump
Linlithgow · EH49
ASHP install in Linlithgow conservation area
12kW ASHP

Conservation-area cottage — 12kW Mitsubishi Ecodan replacing oil. £14,500 covered by HES grant + loan.

£0
Out-of-pocket cost
£980
Annual heating cost cut
Read full case study

Want your project on this page?

Free fixed-price quote in 24 hours. Every install case-studied with your permission.

Ready when you are

Free quote in 24 hours.

No high-pressure sales. No commission-driven scripts. Just a no-obligation survey + transparent quote — covering every postcode in Scotland's Central Belt.

MCS Certified
TrustMark Registered
HES Grant Specialist
30-Year Panel Warranty
📞Call 💬WhatsApp Get Free Quote → Responds within 2 hours