50kWp + 30kWh BESS for Fife care home
Nursing home — 50kWp + 30kWh battery for night-time medical loads. EPS backup wired to critical circuits.
The project
32-bed nursing home with significant 24/7 electrical loads — oxygen concentrators, hoists, heating circulation pumps, kitchen, laundry. EPS-backup capability was non-negotiable; a power cut could be a clinical-safety event.
Sigenergy SigenStor 30kWh chosen specifically for its EPS backup. Battery wired to a critical-circuits sub-board covering medical equipment, nurse-call, emergency lighting, fridge/freezer.
December 2025: a 4-hour SP Energy Networks fault — the home ran seamlessly on battery the entire time.
Results
Results are specific to this property. Savings depend on the customer's usage patterns, the system's generation and energy prices at the time of install, so your own figures will differ.
Free quote in 24 hours.
No high-pressure sales. No commission-driven scripts. Just a no-obligation survey + transparent quote — covering every postcode in Scotland's Central Belt.