150kWp ground-mount for Bathgate dairy farm
Mixed dairy/arable holding — 150kWp ground-mount with parlour load matching. Capital allowances stacked.
The project
A 320-acre family farm — predominantly dairy with arable rotation — looking to lock energy costs for the next 20 years. Parlour loads (cooling, milking machinery, sterilisation) align almost perfectly with solar generation curves.
Ground-mount across 2.5 acres of marginal land with limited grazing value. Three-phase G99 to SP Energy Networks. Capital allowances claim plus tied-cottage HES qualification on the connected farmhouse.
Now producing more annually than the farm consumes — export revenue offsets fixed grid charges.
Results
Results are specific to this property. Savings depend on the customer's usage patterns, the system's generation and energy prices at the time of install, so your own figures will differ.
Free quote in 24 hours.
No high-pressure sales. No commission-driven scripts. Just a no-obligation survey + transparent quote — covering every postcode in Scotland's Central Belt.