MCS certified
🏆 MCS-cert · 110+ installs · within 2 hours response
MCS Certified · EPVS Audited
Ecoaim
8 min read · 2025-07-20 · Watch + Read

Solar + Battery Install in Livingston — Full Walk-Through

Behind the video: a real 4-bed Livingston solar+battery install. Sizing, install timeline, Octopus Flux config, year-one savings.

▶ Watch the video
📺 2:54 · install · View on the video page →

Watch the video first

📺 Solar & Battery Installation Livingston (2:54)

The setup

A typical 4-bed detached home in Livingston — three teenagers, two adults, one EV-curious driver. Combined gas+electric annual bills had crossed £3,400.

Quote: 8kWp solar + 10kWh battery + future-EV-charger pre-wire. Install timeline: 38 days from first call to commissioning.

What we installed

  • 8kWp solar: 18 × JA Solar 435W all-black panels, split across south-facing rear roof + east return
  • Battery: EcoFlow PowerOcean 10kWh in the integral garage
  • Inverter: EcoFlow PowerOcean P1-5kW single-phase
  • EV pre-wire: Type 2 socket + dedicated 32A spur (for the future Tesla)
  • Monitoring: EcoFlow app + Octopus Mini integration

Day 1: Roof survey + structural assessment

Standard concrete tile, late-1990s build. Structural fine for the array weight. South-facing rear roof oriented at 175° (close to ideal 180°), pitch 35°. Predicted yield 7,200 kWh/year via PVGIS modelling.

Day 28: VAT, export registration + DNO clearance

The install was zero-rated for VAT — 0% applies to qualifying domestic installations until 31 March 2027 — and the system was registered for Smart Export Guarantee payments at commissioning. Customers spreading the cost use lender finance such as Ideal4Finance (FRN 703401), subject to status. SP Energy Networks G99 application accepted in 5 weeks.

Day 32-33: Install

Two-day install. Day 1: scaffolding, panel mounting, DC string runs. Day 2: inverter + battery commissioning, MCS sign-off paperwork.

First full month performance

May 2025 generation: 1,180 kWh. Self-consumed: 850 kWh. Exported: 330 kWh. Octopus Flux peak export: £62. Day-rate import: down 78% vs pre-install baseline.

Five months on — October bill: £18

This is the line that sticks — October bill came in at £18 (vs ~£280/month gas+electric pre-install).

The maths

YearCash position
Year 0 (install)-£14,500 paid outright, zero-rated for VAT
Year 1 saving£1,840 (bill saving + Flux export income)
Year 1 net cash position-£14,500 + £1,840 = -£12,660
Year 5Roughly £9,200 of the outlay recovered
Year 9Cumulative savings cover the initial outlay

Related

Call 03330 384 380 for a free quote in your postcode.

Ready for a free fixed-price quote?

Call 03330 384 380 or get a quote online — survey + quote within 24 hours.

More Ecoaim videos

Want to see more real installs? Watch our other YouTube videos and read the full deep-dives.

All 14 videos →
Ready when you are

Free quote in 24 hours.

No high-pressure sales. No commission-driven scripts. Just a no-obligation survey + transparent quote — covering every postcode in Scotland's Central Belt.

MCS Certified
TrustMark Registered
HES Grant Specialist
30-Year Panel Warranty
📞Call 💬WhatsApp Get Free Quote → Responds within 2 hours