Phase 3 — Commercialisation & O&M
The final phase converts your commissioned asset into measurable financial returns — through tariff selection, export routes, and ongoing operations.
A commissioned solar asset is only valuable when it's generating measurable returns. We tie up the tariff side (which SEG supplier? Octopus Flux variant? Direct PPA?), set up half-hourly metering aligned to your export route, and provide ongoing monitoring with proactive alerting if performance dips.
O&M contracts run from £400-£1,200/year per asset depending on scale and SLA requirements.
Whichever phase you are at, the underlying engineering is set out in full on our commercial solar companies page — 30-500kWp+ sizing against half-hourly demand, the roof-type mounting matrix, the G99 route, and the CapEx / lease / PPA comparison we build into every fixed-price feasibility study. Where a building's fabric is the bigger loss, we will point you at the roof insulation types that cut demand first.
What's included
- SEG/PPA tariff selection
- Export route negotiation
- Half-hourly metering integration
- Performance monitoring + alerting
- Preventative O&M contracts
- Annual yield reviews
See Ecoaim in action
Free quote in 24 hours.
No high-pressure sales. No commission-driven scripts. Just a no-obligation survey + transparent quote — covering every postcode in Scotland's Central Belt.